FUHENG New MaterialsBOPP PEARLIZED FILM
FUHENGNEW MATERIALS 中文

APPLICATION CHECKLIST — BOTTLE LABELS

Bottle-label film purchasing checklist: from drawings to trial records

Copy the seven items below into your own requirements document. Enter what you know, mark missing information as “to be confirmed”, and identify who needs to confirm it.

Copy these seven items first

1. Intended use and actual process

Label use: ____; purchasing film raw material or finished labels: ____

Actual label-converting and label-application method: ____

Open question / confirming party / reference ID: ____

2. Drawings, samples and dimension references

Drawing or reference-sample ID and revision: ____; dimension units: ____

Finished-label dimensions, web direction and cross-web identification: ____; layout information: ____

Open question / confirming party / reference ID: ____

3. Candidate film and specification reference

Film type / grade / sample ID: ____; specification document and revision: ____

Available thickness and corresponding density information: ____

Open question / confirming party / reference ID: ____

4. Roll format and machine-loading requirements

Purchased slit width: ____; core and roll-diameter requirements: ____

Net film weight or roll-length requirement and its basis: ____; winding / unwinding diagram ID: ____

Open question / confirming party / reference ID: ____

5. Use and identification of each film side

Side identification and corresponding treatment information: ____; intended process for each side: ____

Relevant ink, adhesive or other material system, where applicable: ____

Open question / confirming party / reference ID: ____

6. Sample needs and trial records

Sheet sample or trial roll needed: ____; sample / roll ID: ____

Question to verify, trial conditions and agreed evaluation method: ____

Result-record ID: ____ (write “not tested” if no trial has taken place)

Open question / confirming party / reference ID: ____

7. Quantity and supply discussion

Required quantity and units: ____; destination: ____; requested timing: ____

Record confirmed supply arrangements separately from those still to be confirmed: ____

Open question / confirming party / reference ID: ____

This is a purchasing handoff tool, not a technical standard, an acceptance specification or a completed customer case. Fuheng supplies film raw material. The relevant parties need to confirm the finished-label design, actual converting process and equipment requirements. They also agree who is responsible for each confirmation.

Keep drawing dimensions separate from purchased film width

Without a direction reference, “label width” may still leave the recipient unsure which dimension is meant. Show the units, web direction and cross-web direction on the drawing, and retain its revision. Reference samples also need an identifier that links them to the record.

Here, web direction refers to the particular process being recorded. If the source film's MD/TD direction information is needed, separately confirm how it relates to that process's web and cross-web directions; do not assume they are identical.

Finished-label dimensions, cross-web layout and purchased roll width are different pieces of information. Record them separately, then have the actual converter confirm how they relate. Check trim, seam or overlap requirements only where the actual process involves them. Do not fill in a final slit width from bottle circumference, a single-label dimension or a photograph alone.

If the layout is not yet settled, leave slit width open and identify who will provide the layout or equipment requirements. There is no need to guess a value to complete the checklist. Width, core, roll diameter and loading orientation should refer to the same actual equipment requirements; avoid mixing information from different machines or document revisions.

Connect the candidate film to a specific reference

Item 3 links the film type, grade or sample to its specification information. Where thickness, density or other specifications are already available, record their source and revision. Leave missing information for confirmation. Matching thickness does not establish that two films are the same or suitable for the same process.

Fuheng offers a 38 μm water-bottle label film option. Confirm the specific selection against the actual converting requirements.

If you need to check weight per square metre or compare quotations, use the current table based on confirmed film types, thicknesses and densities. This checklist does not repeat the calculations or require measured basis weight before you can organize your requirements.

If item 4 includes roll weight, identify whether it is net film weight or gross weight including the core and packaging. Distinguish estimated roll length from measured length as well. Do not enter an estimated length as a guaranteed number of acceptable labels.

Confirm film sides, winding and machine-loading orientation separately

Review items 4 and 5 together, while keeping three things distinct: the identity of each film side, its orientation in the wound roll, and how the roll is loaded and fed through the actual equipment.

Use consistent, traceable identification for both sides. If you assign “Side A / Side B”, for example, show which is which on the sample identification or diagram. Those letters do not themselves mean that a side is corona-treated, heat-sealable or compatible with an ink or adhesive. Link the treatment information and the intended process to the relevant side separately.

Terms such as “wound in”, “wound out” or “clockwise” may still lack a reference. A winding diagram should identify the viewing direction, film sides and unwinding web direction. Have the actual converter check the machine-loading arrangement and process requirements. A side facing inward or outward in a wound roll does not establish which side of the finished label faces the bottle.

The existing terminology guide describes a common configuration for standard pearlized film: the corona-treated side faces inward and the heat-sealable side outward during winding. This is not universal and must not be applied to all water-bottle label films. Confirm the selected grade’s treated side, heat-sealable side if any, and winding orientation from the relevant information and actual process requirements.

Separate what you intend to test from what the trial shows

Sheet samples can support discussions about appearance and product information. To verify a particular converting process, confirm trial-roll and testing arrangements separately. A sheet-sample policy does not imply a free trial roll or an existing validation result on a particular machine.

Before a trial, have the relevant parties agree on the question to answer, the sample to use, the actual conditions, the observation or measurement method, and how to evaluate the result. The parties confirm the specific measures, methods and evaluation requirements; this checklist supplies no default thresholds.

You can append the following record to item 6 for a particular trial:

  • Trial record ID / date: ____
  • Related drawing revision and sample or roll ID: ____
  • Question to verify: ____
  • Actual equipment, process steps and relevant material system: ____
  • Actual conditions and recorded units: ____
  • Agreed observation or measurement method / document revision: ____
  • Evaluation requirements agreed before the trial and confirming parties: ____
  • Observed or measured results and corresponding records: ____
  • Comparison with agreed requirements / unresolved questions: ____
  • Follow-up confirmation or review actions and responsible parties: ____

After the trial, link the results to that sample and the conditions used. Keep “not tested”, “result awaiting review” and “evaluated against the agreed requirements” as separate statuses. An observation or trial result does not establish performance across all equipment, material systems or batches. Order acceptance still follows the applicable requirements agreed by the parties.

Check that the records connect before handing them over

First check that drawing, sample and candidate-film identifiers correspond. Then check that width, winding and film-side requirements refer to the same converting task. Each open question needs someone to confirm it; do not fill gaps with values from an old order or a different film.

This checklist connects references, open questions and trial records. Use the existing purchasing guide for minimum orders, samples, scheduling and general technical quotation fields, rather than treating this article as another supply commitment.